(VIC) 2B-2 Serviced Apartments Docklands (Waterfront City) – Closing 02/12/2020

(VIC) 2B-2 Serviced Apartments Docklands (Waterfront City) – Closing 02/12/2020

The Project
This design brief has been developed for 55-89 Waterfront Way, Docklands, which will contain the
following features:
> ME000 – Cover sheet
> ME001 – Legend of Symbols & General Notes
> ME010 – Site Plan – Ground Floor
> ME011 – Site Plan – Level 01
> ME012 – Site Plan – Level 02
> ME013 – Site Plan – Level 03-Level 04
> ME300 – Ground Floor – HVAC Layout
> ME301 – Level 1 – HVAC Layouts
> ME314 – Roof Plan – HVAC Layout
> ME600 – Chilled Water Pipework Schematic
> ME601 – Heating Hot Water Pipework Schematic
> ME602 – Air Schematic
> ME700 – Typical Rooms and apartments

ESTIMATOR – Matt Smith 0417 605 800 / mattsmith@ellisair.com.au

CLOSING 02/12/2020